Pine Meadow Village
 
Login | Register
 
Emergency Preparedness
Welcome
About Us
Contact Us
FAQ
Photo Gallery
Community Resources
Location/Map
Search Site
 
Residents
Directory
New Owners
Newsletters and Surveys
Pool/Spa/Tennis
Reserve Clubhouse
Upcoming Events
PMV HOA
Architectural Review Committee
CCR's and Compliance
Financials
Reserve Funding and Studies
Governance
Management/Committees
Meeting Minutes/Agendas
Short Term Rentals
Owner Ticket
 
Board Room
 

 

New Construction
 
 

A Formal Review by the ARC is required for all new  construction. This step requires a fee of $500 payable to PMV Home Owners Association.
 
ARC approval is required for all new construction. After receiving Preliminary Construction Approval,  the applicant is required to submit a final construction application for ARC review. The purpose of the construction plan submission is for the ARC to validate that the set of plans for which the proposed improvement will be constructed is within the concepts of Pine Meadow Village (PMV) and meets the requirements set forth by the PMV HOA governing documents.
Please complete the Construction Approval Checklist and submit to the ARC.
 
While electronic formal submittals are preferred, paper submittals are allowed.  All required information must be completed on the electronic form.  Additionally. please attach your construction plans including:
  • Building Plans at ¼” scale with a Site Plan, Floor Plans, Building Elevations, Building Sections, Exterior lighting. Exterior Materials List: Siding, Trim, Windows, Roofing, Stone, etc.  Note: This must be included on the initial submission to initiate the formal request for approval.
  • Landscape Plans. This may be submitted at a later date, but before landscape work begins.
  • Exterior Colors Plans. This may be submitted at a later date, but before the work begins. For existing homes, ARC submittals are required for color changes AND for repainting or restaining with existing color.  A book containing approved colors can be viewed at the clubhouse by contacting the On-Site Manager or your ARC representative.
 
The end result of the formal submittal will be plan approval, conditional approval or disapproval with emailed and hard copy provided.
 
Below are links for documents that cover specific topics relevant to other aspects of home building and future home maintenance in PMV: